News

Made-to-Order Steel Products for Last-Minute Construction Demands

Posted by Barbara Obeid on Mon, May 18, 2026 @ 12:26 PM

The Steel Supply Company covers the basics like Anchor Bolts, Rust Inhibitive Primer, Hot Dip Galvanized Slotted Shims and More

But the Specialty Items is where your project can benefit the most. Often these things come up at the last minute and same day shipping and fast turn around times can make all the difference.



Stainless Steel Masonry Anchors

 

 

Rod-Anchors---3-Size-350-x-140
In rare cases Slotted Channel, also known as Gripstay™ Channel Slots, and Rod Anchor/Wire Ties will be required to be Stainless Steel. This often results in last-minute ordering. The Steel Supply Company carries ample stock of both items ready for same-day shipping.


Specialty Made to Order Wedges (Knock Out and Slotted)Knock Out Block Wedges

Steel Wedges remain one of the most demanding manufacturing assignments we see. Often it requires several machining steps including
band saw or plasma table cutting for rough shape and careful grinding or milling to achieve a finished product. Care must be taken to avoid warping as stress is relieved.

Wedge Inserts and Askew Bolts


This unique product line is used for hanging Relieving Angles from poured concrete slabs. A fabricator can go many years and never see Wedge Insert - Askew BoltWedge Inserts on a project, and then there they are. Trouble is when they are needed, it is usually for a large quantity. At a spacing of 2 feet apart, each floor of a structure will often use 400 Wedge Inserts. If the building is 10 stories tall it will require 4,000 pc.

For this reason, The Steel Supply Company stocks this product line in depth, again allowing for immediate shipping.

Askew Head Bolts present a similar problem. It is important they be mated with a compatible Wedge Insert. This ensures the bolt head dimensions are correct and provides a secure connection that also allows the bolt to move freely in the cavity of the Insert. Again, ample stock is kept in all lengths of askew head bolt to assure you have the bolts available when needed.

Assuring a project’s needs get met requires deep, long-range inventory of finished goods, comprehensive inventory of raw materials and an array of machining capabilities. Construction projects run on tight schedules and immediate shipping is often the difference that helps our customers stay on time and on budget.

Whether it’s the standard or specialty items, give us a call or email for a

Quote on your next project.

p. 631-212-0728

e. info@thesteelsupplyco.com

CONSTRUCTION MATERIALS PRICES DOWN SLIGHTLY IN OCTOBER BUT CONTINUE TO OUTPACE BUILDING PRICES FOR THE YEAR, CAUSING "DIFFICULTY" FOR CONTRACTORS

Posted by Barbara Obeid on Wed, Nov 30, 2011 @ 12:14 PM

Reprinted from Associated General Contractors of America

To visit the AGC of America website:

http://www.agc.org/cs/news_media/press_room/press_release?pressrelease.id=967

Date: November 15, 2011

Producer Price Index for Construction Materials Climbed 6.9 Percent in Past 12 Months, While Amount Contractors Charge Only Increased Between 3.3 to 4.3 Percent, Construction Economist Notes

The amount contractors pay for a range of key construction materials dropped slightly (-0.6 percent) in October but climbed 6.9 percent from the year-earlier level, according to an analysis of producer price index figures released today by the Associated General Contractors of America. Meanwhile, the price contractors charge for new nonresidential building construction edged up only 3.3 to 4.3 percent over 12 months, depending on building type.

“While the gap is beginning to narrow just a bit, prices for most construction materials have risen far more during the past year than the amount contractors can charge for completing construction projects,” said Ken Simonson, the association’s chief economist. “Coupled with weak growth in demand for construction, the price gap is likely contributing to the stagnant employment levels the industry has been experiencing all year.”

Simonson noted that prices for a number of key construction materials declined during the past month. Prices for diesel fuel dropped 2.2 percent in October, but are up 27.3 percent since October 2010 while prices for copper and brass mills shapes fell -8.3 percent during the past month and -0.2 percent over 12 months. Meanwhile, prices for gypsum and steel mill products increased in October by 3.0 and 0.4 percent respectively. Gypsum prices are down -1.0 percent compared to last year, however, while steel mill product prices are up 13.6 percent over the past year.

“Costs for essential construction materials are likely to remain volatile, causing financial difficulties for some contractors, who must guarantee prices to owners months before purchasing materials,” the economist cautioned. He noted, for example, that in the month since the latest price was collected retail prices for diesel have jumped 26 cents per gallon.

Simonson observed that the price index for new construction – what contractors charge for construction projects – increased during the past month and is up compared to last year. The price of new industrial buildings rose 1.5 percent during the past month and 3.4 percent for the year. New warehouses rose 1.6 percent in October and 3.9 percent compared to October 2010. The price for new school construction increased by 1.8 percent compared the prior month and is up 4.3 percent compared to last year. And new office construction rose 1.0 percent in October and is 3.3 percent higher than last year.

CONSTRUCTION MATERIALS PRICES FLATTEN IN SEPTEMBER BUT CONTINUE TO OUTPACE BUILDING PRICES, ADDING TO COST SQUEEZE FOR CONTRACTORS

Posted by Barbara Obeid on Wed, Nov 30, 2011 @ 12:13 PM

Reprinted from Associated General Contractors of America

To visit the AGC of America website:

http://www.agc.org/cs/news_media/press_room/press_release?pressrelease.id=935

Date: October 18, 2011

Producer Price Index for Construction Materials Climbed 8.1 Percent in Past 12 Months, While Amount Contractors Charge Only Increased Between 2 to 3 Percent, Construction Economist Notes 

The amount contractors pay for a range of key construction materials held steady in September but climbed 8.1 percent from the year-earlier level, according to an analysis of producer price index figures released today by the Associated General Contractors of America. Meanwhile, the price contractors charge for new nonresidential building construction edged up only 2 to 3 percent over 12 months, depending on building type. 

“Feeble demand for construction is forcing contractors to absorb the bulk of materials price hikes, instead of passing them along to owners,” said Ken Simonson, the association’s chief economist. “This pattern has persisted for more than two years, and many contractors are increasingly at risk of going under.”  

Simonson noted that key materials showed divergent price trends in September but all posted double-digit year-over-year increases. Those materials include diesel fuel, which was up 3.3 percent for the month and 39.4 percent since September 2010; copper and brass mill shapes, down 0.7 percent in September but up 14.8 percent over 12 months; steel mill products, which slipped 0.6 percent for the month but rose 13.5 percent for the year; and aluminum mill shapes, down 1.8 percent for the month but up 10.4 percent from a year earlier. 

“These prices can spike anytime there is a global supply disruption or a consensus that demand is strengthening worldwide, not just from U.S. construction,” Simonson explained. “In contrast, materials produced here and used only by U.S. construction have shown little price movement.” He cited, as examples, the producer price indexes for concrete products, up 0.2 percent in September and 0.3 percent over 12 months; lumber and plywood, down 1.3 percent for the month and 0.4 percent for the year; and gypsum products such as wallboard, down 1.7 percent and 4.6 percent, respectively. 

Simonson observed that the price index for new construction – what contractors charge for construction projects – rose 2.2 percent over 12 months for industrial buildings, 2.6 percent for offices, 2.8 percent for warehouses and 3.0 percent for schools. “In light of the much steeper materials cost increases, these gains are not enough to keep contractors solvent,” he warned. 

Association officials said that in addition to the cost squeeze, the construction industry was suffering from decreasing demand for public sector construction activity. They said that while state and local construction budgets will continue to contract for the foreseeable future, Washington could help offset some of the decline by enacting legislation to make needed, long-term, investments in highways, transit systems, clean water systems, airports and runways. 

“Given the stagnant construction bid prices, taxpayers stand to benefit if Washington acts quickly to enact new infrastructure investments,” Stephen E. Sandherr. “Even if construction prices rebound in the near future, it is still a lot less expensive to maintain infrastructure while it is operating than to fix it once it breaks.”